Implementing a new system involves careful consideration of the transition process. Here are several approaches to putting a new system into operation, each with its own advantages and considerations:

Direct Cutover:
In the direct cutover method, the changeover from the old system to the new system is abrupt and immediate. It is the least expensive option in terms of resources and time, but it can also carry higher risks due to the sudden shift. Direct cutover can lead to potential disruptions if issues arise after the switch.

Parallel Operation:
Parallel operation requires both the old and new systems to run simultaneously for a predetermined period. While it provides a safe environment for testing and mitigates risks, it is the slowest approach due to dual operations. This method can be resource-intensive and might extend the overall implementation timeline.

Pilot Operation:
The pilot operation introduces the new system to a select group of users while keeping the old system operational for others. This method reduces the risk of a complete system failure and provides valuable user feedback. However, it requires careful coordination between the pilot group and the rest of the users.
Phased Operation:
Phased operation involves implementing the new system in stages or modules. Each subsystem can use any of the above methods for changeover. This approach allows for a more controlled transition, reducing the overall risk. However, it requires strong project management to ensure seamless integration of different phases.
Each method has its benefits and challenges, making the choice dependent on factors such as budget, timeline, system complexity, and risk tolerance. Organizations need to carefully evaluate these factors and choose an implementation approach that aligns with their specific needs and circumstances. Proper planning, testing, and user involvement are essential for a successful system implementation, regardless of the chosen method.